Seller comments
**Ketch sailing yacht built at the Italian shipyard RPD – Oceanica, designed by the renowned English naval architect Sir Laurent Giles, known for designing many famous yachts for the Royal Ocean Racing Club, including the revolutionary Myth of Malham.**
A robust yacht designed for comfortable sailing in rough seas, yet faster than most standard charter boats.
The yacht sailed under the Italian flag until 2024, when it was inspected by the Croatian Register of Shipping and entered into the registry. In September 2024, it underwent a technical inspection by the Murter port authority and was thereafter registered in Murter (14 October 2025).
Registered capacity is **11 persons**. Fuel tank: **300 L**; freshwater tanks: **800 L**.
It features **4 cabins with 8 berths**, plus two additional berths convertible in the saloon; **2 bathrooms (WCs)**; a **central cockpit**; and, besides the main companionway, an additional aft companionway. Equipment includes a dinghy with outboard engine, blackwater tank, deck shower, SmartSolar charger with solar panel port in the cockpit, two bilge pumps, a pump in the bow locker, and stern davits for the dinghy.
There are **two pairs of cockpit winches** (primary winches with 3 speeds) and **five mast winches** for halyards. The yacht is equipped with a stainless-steel main anchor with 60 m of chain, double forestay, inner stay for the staysail and storm jib, hydraulic steering, VHF radio, GARMIN autopilot, depth sounder, and windex.
**Sails:** two mainsails, two genoas, staysail (trinchetta), storm jib.
**Galley:** fully equipped with all kitchenware, large fridge with freezer, hot water heater, double sink, gas stove with oven.
A large quantity of spare parts and equipment is included. All systems are functional, and the yacht is fully equipped and ready for long-distance cruising.
Video available at: [https://www.youtube.com/watch?v=OMFBTpjXB4c](https://www.youtube.com/watch?v=OMFBTpjXB4c)
---
### **Work completed in 2024:**
* Complete overhaul of the Mercedes Nanni 220S engine
* Installation of two new service batteries and one new starter battery
* Replacement of pumps
* Removal and servicing of the mast, including installation of new electrical wiring through the mast
* Standing rigging strength-tested
* Antifouling and hull polishing
### **Work completed in 2025:**
* New full-batten mainsail and new mizzen sail
* All running rigging replaced
* New mattresses made for all berths and the saloon