General InformationChange
unit of measurement >
|
Make/model
|
DEVONPORT Challenge 67
|
|
Name of boat
|
CHALLENGER
|
|
Year of manufacture
|
1992
|
|
Length overall
|
20.42 metres
|
|
Length waterline
|
16.76 metres
|
|
Beam
|
5.26 metres
|
|
Draft
|
2.90 metres
|
|
Displacement
|
37,989 kg
|
|
Hull
|
Steel
|
|
Location
|
United Kingdom
|
Propulsion
|
Engine
|
1 x Perkins
|
|
Fuel
|
Diesel
|
Description
DEVONPORT Challenge 67
SPECIFICATION
The Challenge 67' Class yachts were designed for The Challenge Business by David Thomas,specifically to race around the world the wrong way. The design brief called for exceptionally strong, seaworthy, fast, attractive, modern, steel yachts that were able to sail to windward across the Southern Ocean in relative comfort.
Safety was paramount both in terms of structural strength and crew safety. Because of the One Design nature of the race, the design was not influenced or distorted by any rating rule and a sensible displacement was specified. Other important design considerations include, ease of access to the structure, equipment, systems, wiring and fittings for maintenance and inspections both at sea and in harbour. Every piece of equipment had to be robust enough to survive a race around the world with minimum maintenance.
Many of the design principles were based on Sir Chay Blyths (then unique) experience of sailing around the world single handed against the prevailing winds and currents.
Devonport Yachts (DML) were chosen to build the fleet to Bureau Veritas highest notation. The construction method allows relatively simple and cost effective alterations to the interior layout.
Dimensions:
LOA
67ft 0in
20.42m
LWL
55ft 0in
17.76m
Beam
17ft 3in
5.26m
Draught
9ft 6in
2.82m
Top of mast from waterline
85ft 3in
25.98m
Displacement
38 tons half load
Ballast keel
12 tons
Tankage:
Fuel
385 gallons
1900 litres
Water
242 gallons
1100 litres
Sail Areas:
Including 100% foretriangle
1,932 sq ft
179.49 sq m
Main
926 sq ft
86.01 sq m
Genoa
1,480 sq ft
137.49 sq m
Spinnaker
3,780 sq ft
351.17 sq m
Yacht Designer and Design Team:
Designer
David Thomas
Working Drawings
Thanos Condylis of C & S Yacht Designs
Structural Engineering
Roger Scammell
Builder
Devonport Yachts Ltd
Build Date
Challenge Business 21 through to 30 first launched 1992
Challenge Business 31 through to 35 first launched 1996
Safety Standards, Surveys & Regulatory Bodies:
All the Challenge yachts have been built under Bureau Veritas supervision to their highest yacht notation.
Design Approval
Bureau Veritas
Classification Authority
Bureau Veritas
Bureau Veritas Class
+I 3/3 Charter Yacht /S (yacht removed from class by Challenge Business in Sept 2000)
MCA compliance Surveys & Inspections by
MECAL (Certifying Authority of the Institute of Marine Engineers)
Royal Ocean Racing Club
ORC Cat 0
Construction and Fit Out Detail:
The yachts were designed to be exceptionally strongly built of steel in order that they could face all that the Southern Ocean might throw at them, with absolute confidence. The hulls are constructed of high tensile steel shell plating over T bar longitudinals and angle ring frames. A full depth skeg and ertalite bearings provide support for the steel rudder and good engineering ensures absolute reliability.
The entire deck and superstructures are of stainless steel in order to reduce maintenance to a minimum. The stainless steel fuel, water and sullage tanks are provided with good access for cleaning. The International Paint coating systems are the best that current paint technology can provide with the result that on return from the worlds toughest yacht race, the yachts looked as if they had returned from a summer cruise.
Above the waterline the hull and deck are lined with approximately 60 mm of sprayed Polyurethane foam to provide thermal and sound insulation. The extensive use of Warerite laminates in the interior fit out, ensure light, bright accommodation, which is easy to maintain and keep clean. Maple hull liners and Afrormosa trim are highlighted by the white bulkheads and provide a warm comfortable feel to the accommodation.
Hull Shell Plating & Stringers
British Steel
- 50A Steel
Hull & Deck Framing
British Steel
- 43A Steel
Deck, Deckhouse, Coamings & Plinths
British Steel
- 316 Stainless Steel
Ballast Keel
Cast Iron by Iron Brothers Ltd
Keel Bolts
16 x 30mm Bolts
Interior
Marine plywood with Warerite laminate surfaces
Interior Trim
Afrormosia and Maple bright work in accommodation, Iroko bright work in sailroom
Non Slip Deck Covering Material
TBS.
In 2005/06 it was found that the plating thickness in the hull beneath the waterline on CHALLENGER was unacceptably thin. Accordingly, Berthon removed the interior joinery, shot blasted the whole interior bilge, cut out all areas of thin plating and re-plated these areas. This involved around 25% of the original plating between the aft and forward watertight bulkheads. The steel work was then repainted. The bilges were repainted in 2008 prior to her last circumnavigation.
Rig:
Type
Bermudan Cutter
Mast & Spars
Atlantic Spars Ltd, Brixham, Devon
These were new in 1996. The rig has now sailed many thousands of miles and a recent rig report, which is available on request, advises that it is now at the end of its useful life. A prospective purchaser should budget for its replacement in any offer that they may make.
Deck Layout & Equipment:
The deck layout was designed to be safe, seaman like, efficient and provide as much protection for the crew as practically possible, even in extreme Southern Ocean conditions. The deck hatches are defended from wave action by plinths. Dorade vents keep the accommodation well ventilated even in extreme conditions.
The aft cockpit is particularly comfortable and the bridgedeck area ideal for corporate entertaining.
During their circumnavigation's both Mike Golding and Sam Brewster illustrated that the yachts can be sailed single handed fast, safely and efficiently.
The deck equipment was selected for its efficiency, robustness and ease of maintenance. All the equipment used fully justified its selection and remains in good condition.
Deck Equipment:
Blocks
Lewmar Marine Ltd & Atlantic Spars Ltd
Companionway Hatch
Goiot
Deck Hatches & Port-lights
Lewmar Marine Ltd
Jammers, Genoa Tracks & Cars
Atlantic Spars Ltd
Mainsheet System & Foot-blocks
Lewmar Marine Ltd
Pulpits Stanchions & Fabrications
Hercules CSMD
Steering Gear & Wheels
Edson
Radar Mounting Structure
Scanstrut
Winches
Harken self tailing winches with stainless steel drums 2 x 66st, 7 x 56st, 2 x 53st, 2 x 32st. Muir anchor windlass
The amount of deck gear, manufacturer and condition is not warranted.
Sail Inventory:
Dacron sails
Mainsail - fully battened, No 1 Yankee, No 2 Yankee, No 3 Yankee, Staysail, Storm Staysail , Storm Trysail.
Spinnaker
Heavy spinnaker
Condition and age not warranted.
Accommodation
The Challenge Fleet were designed to be self-sufficient and have adequate stowage to enable them to stay at sea for up to 55 days in any part of any Ocean. The Challenge races have illustrated the yacht's ability to do this with a surprising degree of comfort, in absolute safety. A multitude of handrails & pillars allows safe movement below decks. The saloon is light, airy and dry with good ventilation, which enables food to be prepared in tropical or Southern Ocean conditions in the galley. The comfortable seating area has fabric upholstery.
The fourteen berths are situated in 6 cabins. All berths have high leecloths for security at sea and comfort at any angle of heel. A box stowage system enables dry and orderly stowage of clothing and personal belongings in each cabin. Each cabin has a cowl vent and hatch/skylight.
Accommodation from Forward to Aft
Sailroom
The sailroom is situated aft of the collision bulkhead and thefull inventory of sails can be stowed here together with all the warps, fenders, sheets and guys. A central passageway runs aft from the sailroom to the deckhouse
Head & Shower Compartments
Head/shower compartments are situated on either side, each with Exalto Rheinstorm Y4 toilet, washbasin and shower.
Forward Cabins
Mirror image cabins are situated aft of the heads compartments. Each has two berths and box stowage racks.
Amidships Cabins
Each amidships cabin has three berths with box stowage outboard at the forward end.
Chartroom/Deckhouse
The navigation & communication equipment is situated around the full size chart table, as are the Perspex covered switch panels. Off watch seating allows good visibility through the deckhouse windows.
Drying/Oilskin Room
With hanging/drying space for a full compliment of foul weather gear.
Cabins
14 berths in 6 cabins. All berths have very high leecloths for security at sea. A box stowage system enables dry and orderly stowage of clothing and personal belongings.
Saloon
The whole crew can be seated around the saloon table. Stowage areas and cupboards are arranged outboard and below the comfortable seating.
Galley
A gimbaled 4-burner domestic size Calor gas hob is mounted in a custom-made stainless steel housing. Substantial fiddles allow safe preparation of food at sea in virtually any conditions. A separate Calor gas oven is mounted at the forward end of the proper sea going galley. There is a separate Grunert fridge and deepfreeze fitted.
Aft Cabins
Each aft cabin has two berths and stowage
Mechanical & Electrical Systems
Mechanical
All the mechanical systems are robust with good access to permit easy and efficient maintenance both at sea and in harbour. The equipment was chosen for reliability and long service life.
Main Engine
130 hp (96kW) Perkins Sabre M130C 6 cylinder naturally aspirated diesel drives the propeller through a PRM 302 gearbox. Engine mounts replaced 2008.
Propeller
Bruntons Autoprop
Generator
Onan 7.5kw diesel generator (2008).
Heaters
Two Eberspacher Airtronic diesel hot air heaters (2008)
Watermaker
Horizon Seafari (2008)
Electrical
All the electrical wiring together with the switch panels and fittings are of high quality for reliability and safety. The major cable runs are easily accessible with no wiring below the cabin soles. The major systems are all 24 volts.
Batteries
Batteries from 2008. Service - 4 x 200 amp hours, Engine start - 2 x 90 amp hours and Generator start - 1 x 60 amp hour (12 volt).
The batteries are in storage and their condition is not warranted.
Switch Panels
Newmar electrical panels with circuit breakers, ammeters and voltmeters.
Electrical Standards
Bureau Veritas approved cabling and components.
Navigation & Communication Equipment
McMurdo ICS Nov 6 Navtex
Raymarine E120 Plotter/radar and repeater at cockpit
Raymarine A6J
Thrane & Thrane Inmarsat C Terminal
Raymarine ST290 and 2 x repeater in cockpit sailing instrumentation
Icom IC-601 VHF
Icom IC SSB
Iridium Phone
Raymarine ST60+ Autopilot at cockpit
Raymarine ST290 Wind analogue in cockpit
Suunto pedestal compass.
History of Challenge Yachts
Yachts Challenge Business 21, 22, 23, 24, 26, 27, 28, 29 & 30 were part of the ten strong fleet which raced around the world in the British Steel Challenge in 1992/93. During the autumn of 1995 they underwent a series of detailed surveys and inspections. Whist the yachts and all their systems/equipment were found to be in exceptionally good condition, they underwent a major refit. CHALLENGER was built as CHALLENGE BUSINESS 26.
The refit amounted to a virtual rebuild with all the systems and equipment being replaced. This included new plumbing, wiring, engine, generator, batteries, pumps, deck equipment, steering gear, mast, spars, rigging and sails. Exactly the same amount of equipment and components were supplied to the original yachts for their refit as for the new yacht build. Shot blasting and repainting further ensured that the yachts were returned to 'as new condition'. As a result it was virtually impossible to identify from which build period each yacht originated. The specification was identical to the newly built yachts, as was their structural and cosmetic condition.
Yachts Challenge Business 31 through to 35 were built during 1994/95 and launched, together with the refitted yachts, in April 1996. All the Challenge 67' yachts benefited from the lessons learned in the outstandingly successful British Steel Challenge, with many detailed changes/developments being incorporated during this refit.
The Challenge Fleet sailed a combined distance of over two million miles since the proto-type was launched in 1990. The fourteen strong, BT Global Challenge fleet proved to be extremely reliable with identical performance.
Conclusions
The Challenge 67' Class yachts have proven themselves to be out standing yachts; they are probably the strongest and most seaworthy fleet ever to have raced around the world.
The yachts have an almost legendary reputation for their performance in difficult conditions, comfort at sea and confidence inspiring ability. Their strength and ability also makes them ideal for high latitudes and gives almost unique access to many places that are inaccessible by other means.
The design lends itself to a wide variety of uses as well as Ocean Racing. The deck layout and accommodation makes the yachts suitable for corporate entertaining, adventure sailing, chartering and private use. The accommodation layout could be economically and quickly changed by virtue of the fact that the bulkheads do not penetrate the cabin soles.
The Challenge 67' class yachts quality equipment and sound engineering ensures reliability and low maintenance costs. The frequent and stringent regime of surveys and inspections has illustrated that well built and maintained steel yachts can race around the world at least twice in the worlds toughest yacht race and still remain in Bureau Veritas highest notation. The surveys also show that the yachts are in extremely good condition and ready for further Challenges.
Brokers Comments
CHALLENGER was built as CHALLENGE BUSINESS 26. During her career with Challenge Business and with the Ministry of Defence she has safely sailed many thousands of miles. She is now being offered as is, where is, and prospective purchasers are encouraged to examine the yacht carefully to satisfy themselves as to her structural and operational state. The yacht is being sold as is, where is, including the sails currently being stored at Berthon. She has no other inventory.
This DEVONPORT Challenge 67 has been viewed 1964 times